From: Integrated Equipment Health Prognosis Considering Crack Initiation Time Uncertainty and Random Shock
Path # | \(m\) | \(t_{0}\) / cycles | Failure time / cycles | Inspection interval / cycles |
---|---|---|---|---|
1 | 1.6 | 1.7\(\times 1 0^{6}\) | 4215500 | 3\(\times 1 0^{5}\) |
2 | 1.6 | 2.3\(\times 1 0^{6}\) | 4815500 | 5\(\times 1 0^{5}\) |