From: Integrated Equipment Health Prognosis Considering Crack Initiation Time Uncertainty and Random Shock
Update # | Inspection time / cycles | Crack size / mm | Mean of \(m\) | Mean of \(t_{0}\) / cycles | Mean of \(F(t_{0} ,m)\) / cycles |
---|---|---|---|---|---|
Prior | Â | Â | 1.4 | 2\(\times 1 0^{6}\) | 17159000 |
1 | 3215700 | 1.591 | 1.5469 | 1.9827\(\times 1 0^{6}\) | 5520800 |
2 | 3715700 | 2.3063 | 1.5545 | 1.9999\(\times 1 0^{6}\) | 5358600 |
3 | 4215700 | 3.4307 | 1.5821 | 2.1583\(\times 1 0^{6}\) | 5135000 |
4 | 4715700 | 5.0218 | 1.6073 | 2.3604\(\times 1 0^{6}\) | 5087700 |
Actual value | Â | Â | 1.6 | 2.3\(\times 1 0^{6}\) | 4815500 |