Skip to main content
Figure 2 | Chinese Journal of Mechanical Engineering

Figure 2

From: Car Fuel Economy Simulation Forecast Method Based on CVT Efficiencies Measured from Bench Test

Figure 2

Wiring diagram of the CVT efficiency bench test. 1. Input motor, 2. Input torque and speed sensor, 3. Input coupling, 4. Mounting plate of CVT and bearing seat, 5. TCU of test CVT, 6. Test CVT box, 7. Output universal joint and axle, 8. Cooling fan, 9. Output torque and speed sensor, 10. Output load motor, 11. Torque and speed sensor control cabinet, 12. Cooling fan controller, 13. Data collection equipment, 14. Motor control computer, 15. CVT control computer, 16. Motor control cabinet

Back to article page