From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Size | α | Total number | Number of optimal solutions | |||
---|---|---|---|---|---|---|
GATS_FCFS | GATS_ LTBA | GATS_STD | GATS_GWTQ | |||
Small | Small | 18 | 10 | 7 | 0 | 10 |
Small | Large | 18 | 5 | 2 | 5 | 7 |
Large | Small | 6 | 3 | 1 | 0 | 3 |
Large | Large | 6 | 4 | 1 | 1 | 0 |
Group2 | 10 | 8 | 0 | 0 | 2 | |
Total | 58 | 30 | 11 | 6 | 22 |