From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Size | α | Total number | Number of optimal solutions | |||
---|---|---|---|---|---|---|
GATS_FCFS | GATS_ LTBA | GATS_STD | GATS_GWTQ | |||
Small | Small | 18 | 9 | 6 | 0 | 6 |
Small | Large | 18 | 8 | 1 | 4 | 8 |
Large | Small | 6 | 3 | 1 | 0 | 2 |
Large | Large | 6 | 3 | 0 | 1 | 2 |
Group2 | 10 | 6 | 0 | 0 | 4 | |
Total | 58 | 29 | 8 | 5 | 22 |