Table 15 Comparison about best makespan on Group 1 with small-size and small-α

From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Job Stage AGV α GA SA ABC GWO MBO GATS
10 5 2 0.10 424 425 421 423 421 421
4 423 424 423 423 423 423
6 423 424 423 423 423 423
10 2 0.14 832 844 835 842 830 830
4 830 837 836 834 830 830
6 835 830 830 834 830 830
20 5 2 0.10 688 707 709 724 681 687
4 686 699 690 700 682 681
6 688 685 693 698 677 677
10 2 0.17 974 996 997 992 948 974
4 871 876 861 896 862 860
6 867 877 880 880 850 842
30 5 2 0.11 742 724 766 763 714 720
4 719 725 734 734 703 696
6 707 718 718 733 700 686
10 2 0.16 1485 1497 1522 1531 1459 1485
4 1149 1194 1201 1200 1152 1161
6 1151 1159 1186 1178 1137 1115
Number of optimal solutions 3 1 4 2 12 13