Skip to main content

Table 16 Comparison about average makespan on Group 1 with small-size and small-α

From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Job Stage AGV α GA SA ABC GWO MBO GATS
10 5 2 0.10 435 433 425 428 422 426
4 434 428 425 424 425 423
6 431 427 424 424 424 423
10 2 0.14 854 848 844 851 837 833
4 845 844 841 843 838 835
6 843 840 835 844 833 839
20 5 2 0.10 707 711 714 736 688 694
4 698 705 700 711 686 685
6 698 698 702 712 686 685
10 2 0.17 1007 1009 1011 1017 961 991
4 892 893 885 906 876 861
6 885 881 889 897 855 855
30 5 2 0.11 758 752 775 772 733 731
4 729 730 743 738 711 700
6 724 728 737 736 707 699
10 2 0.16 1510 1519 1529 1536 1464 1531
4 1197 1201 1212 1211 1173 1167
6 1176 1171 1188 1185 1144 1123
Number of optimal solutions 1 0 0 0 6 13