From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | α | GA | SA | ABC | GWO | MBO | GATS |
---|---|---|---|---|---|---|---|---|---|
80 | 5 | 4 | 0.43 | 3078 | 3091 | 3067 | 3063 | 3067 | 3022 |
6 | 2288 | 2254 | 2334 | 2281 | 2235 | 2183 | |||
8 | 2133 | 2126 | 2186 | 2139 | 2093 | 2076 | |||
160 | 5 | 4 | 0.40 | 6441 | 6498 | 6485 | 6465 | 6501 | 6380 |
6 | 4871 | 4799 | 5008 | 4772 | 4792 | 4681 | |||
8 | 4534 | 4416 | 4659 | 4367 | 4518 | 4373 | |||
Number of optimal solutions | 0 | 0 | 0 | 1 | 0 | 5 |