From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | α | GA | SA | ABC | GWO | MBO | GATS |
---|---|---|---|---|---|---|---|---|---|
10 | 2 | 4 | 0.80 | 387 | 384 | 378 | 393 | 381 | 377 |
4 | 6 | 0.73 | 485 | 479 | 472 | 490 | 479 | 474 | |
6 | 6 | 0.71 | 728 | 728 | 717 | 724 | 718 | 712 | |
8 | 10 | 0.69 | 835 | 832 | 845 | 848 | 834 | 832 | |
10 | 10 | 0.69 | 1058 | 1047 | 1053 | 1058 | 1051 | 1038 | |
20 | 2 | 6 | 0.77 | 496 | 494 | 497 | 519 | 476 | 465 |
4 | 8 | 0.65 | 746 | 751 | 751 | 750 | 740 | 740 | |
6 | 12 | 0.67 | 895 | 911 | 906 | 914 | 894 | 885 | |
8 | 12 | 0.70 | 1241 | 1230 | 1222 | 1240 | 1203 | 1216 | |
10 | 14 | 0.67 | 1336 | 1365 | 1362 | 1363 | 1336 | 1336 | |
Number of optimal solutions | 1 | 1 | 1 | 0 | 3 | 8 |