Skip to main content

Table 24 Comparison about average makespan on Group 2

From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Job Stage AGV α GA SA ABC GWO MBO GATS
10 2 4 0.80 397 389 384 396 383 380
4 6 0.73 493 482 480 492 481 479
6 6 0.71 735 733 725 739 722 731
8 10 0.69 846 843 847 852 837 838
10 10 0.69 1062 1060 1057 1060 1053 1050
20 2 6 0.77 502 500 502 526 484 481
4 8 0.65 766 763 762 775 746 755
6 12 0.67 910 920 920 925 900 899
8 12 0.70 1245 1238 1233 1247 1214 1229
10 14 0.67 1364 1371 1364 1372 1344 1369
Number of optimal solutions 0 0 0 0 5 5