Table 25 Comparison about average CPU time on Group 1 with small-size

From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Job Stage AGV GA(s) SA(s) ABC(s) GWO(s) MBO(s) GATS(s)
10 5 2 30.5 28.4 27.0 28.4 15.5 19.1
4 32.7 23.4 33.7 40.2 22.1 25.2
6 34.5 30.7 40.8 55.6 30.0 31.3
10 2 69.3 54.4 56.5 61.9 54.9 57.9
4 74.0 79.6 72.1 87.2 77.6 70.2
6 86.0 88.6 84.4 110.6 89.7 81.7
20 5 2 67.5 51.9 53.9 56.4 50.1 55.1
4 68.1 69.7 68.4 81.9 72.8 66.5
6 68.3 75.1 84.1 111.5 97.3 77.4
10 2 114.9 91.0 104.6 109.2 90.0 113.0
4 136.3 101.2 129.5 159.1 110.7 136.5
6 151.8 135.2 164.4 227.4 205.2 159.9
30 5 2 61.4 64.8 75.4 78.3 62.6 62.1
4 95.3 87.0 96.6 114.7 90.8 99.5
6 108.5 99.7 114.3 149.4 125.0 114.7
10 2 146.7 144.4 155.6 135.6 126.4 139.4
4 218.7 138.8 195.3 237.9 192.4 205.3
6 227.4 189.1 236.3 315.6 252.1 241.1