From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | GA(s) | SA(s) | ABC(s) | GWO(s) | MBO(s) | GATS(s) |
---|---|---|---|---|---|---|---|---|
10 | 5 | 2 | 30.5 | 28.4 | 27.0 | 28.4 | 15.5 | 19.1 |
4 | 32.7 | 23.4 | 33.7 | 40.2 | 22.1 | 25.2 | ||
6 | 34.5 | 30.7 | 40.8 | 55.6 | 30.0 | 31.3 | ||
10 | 2 | 69.3 | 54.4 | 56.5 | 61.9 | 54.9 | 57.9 | |
4 | 74.0 | 79.6 | 72.1 | 87.2 | 77.6 | 70.2 | ||
6 | 86.0 | 88.6 | 84.4 | 110.6 | 89.7 | 81.7 | ||
20 | 5 | 2 | 67.5 | 51.9 | 53.9 | 56.4 | 50.1 | 55.1 |
4 | 68.1 | 69.7 | 68.4 | 81.9 | 72.8 | 66.5 | ||
6 | 68.3 | 75.1 | 84.1 | 111.5 | 97.3 | 77.4 | ||
10 | 2 | 114.9 | 91.0 | 104.6 | 109.2 | 90.0 | 113.0 | |
4 | 136.3 | 101.2 | 129.5 | 159.1 | 110.7 | 136.5 | ||
6 | 151.8 | 135.2 | 164.4 | 227.4 | 205.2 | 159.9 | ||
30 | 5 | 2 | 61.4 | 64.8 | 75.4 | 78.3 | 62.6 | 62.1 |
4 | 95.3 | 87.0 | 96.6 | 114.7 | 90.8 | 99.5 | ||
6 | 108.5 | 99.7 | 114.3 | 149.4 | 125.0 | 114.7 | ||
10 | 2 | 146.7 | 144.4 | 155.6 | 135.6 | 126.4 | 139.4 | |
4 | 218.7 | 138.8 | 195.3 | 237.9 | 192.4 | 205.3 | ||
6 | 227.4 | 189.1 | 236.3 | 315.6 | 252.1 | 241.1 |