From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | GA(s) | SA(s) | ABC(s) | GWO(s) | MBO(s) | GATS(s) |
---|---|---|---|---|---|---|---|---|
80 | 5 | 4 | 232.3 | 203.6 | 286.4 | 346.7 | 267.1 | 268.1 |
6 | 325.5 | 269.3 | 348.9 | 449.4 | 357.2 | 351.5 | ||
8 | 404.0 | 337.6 | 426.7 | 566.8 | 444.2 | 402.1 | ||
160 | 5 | 4 | 706.3 | 498.1 | 717.7 | 861.6 | 680.7 | 770.9 |
6 | 901.0 | 690.3 | 862.2 | 1123 | 948.4 | 943.6 | ||
8 | 1048.8 | 913.8 | 1083.9 | 1464.3 | 1166.5 | 1011.6 |