Skip to main content

Table 26 Comparison about average CPU time on Group 1 with large-size

From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Job Stage AGV GA(s) SA(s) ABC(s) GWO(s) MBO(s) GATS(s)
80 5 4 232.3 203.6 286.4 346.7 267.1 268.1
6 325.5 269.3 348.9 449.4 357.2 351.5
8 404.0 337.6 426.7 566.8 444.2 402.1
160 5 4 706.3 498.1 717.7 861.6 680.7 770.9
6 901.0 690.3 862.2 1123 948.4 943.6
8 1048.8 913.8 1083.9 1464.3 1166.5 1011.6