From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Size | α | Total number | Number of optimal solutions | |||||
---|---|---|---|---|---|---|---|---|
GA | SA | ABC | GWO | MBO | GATS | |||
Small | Small | 18 | 3 | 1 | 4 | 2 | 12 | 13 |
Small | Large | 18 | 5 | 2 | 1 | 0 | 5 | 9 |
Large | Small | 6 | 0 | 1 | 0 | 0 | 0 | 5 |
Large | Large | 6 | 0 | 0 | 0 | 1 | 0 | 5 |
Group 2 | 10 | 1 | 1 | 1 | 0 | 3 | 8 | |
Total | 58 | 9 | 5 | 6 | 3 | 20 | 40 |