Figure 29From: Simulation Analysis of Torsion Beam Hydroforming Based on the Fluid-Solid Coupling MethodCloud maps of the wall thickness of sections during torsion beam forming: (a) Cloud maps of the wall thickness of sections A–A, D–D, and F–F during the closing of the upper mold clamping, (b) Cloud maps of the wall thickness of sections A–A, D–D, and F–F during sliding mold clamping closing, (c) Cloud maps of the wall thickness of sections A–A, D–D, and F–F during the closing of the hydraulic bulgingBack to article page