Skip to main content

Table 3 Production efficiency of the two kinds of mold inserts

From: Corrosion Behavior of the S136 Mold Steel Fabricated by Selective Laser Melting

 

Filling and holding time (s)

Cooling time (s)

Production cycle (s)

SLM insert

7

16

40

Traditional insert

7

25

48