From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | α | GA | SA | ABC | GWO | MBO | GATS |
---|---|---|---|---|---|---|---|---|---|
80 | 5 | 4 | 0.10 | 2066 | 2000 | 2056 | 2057 | 2041 | 2024 |
6 | 2014 | 2019 | 2046 | 2048 | 2027 | 1996 | |||
8 | 2054 | 2014 | 2051 | 2034 | 2036 | 1989 | |||
160 | 5 | 4 | 0.10 | 4300 | 4265 | 4390 | 4279 | 4254 | 4212 |
6 | 4265 | 4219 | 4315 | 4248 | 4233 | 4195 | |||
8 | 4234 | 4205 | 4305 | 4239 | 4278 | 4199 | |||
Number of optimal solutions | 0 | 1 | 0 | 0 | 0 | 5 |