From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | α | GA | SA | ABC | GWO | MBO | GATS |
---|---|---|---|---|---|---|---|---|---|
80 | 5 | 4 | 0.10 | 2085 | 2037 | 2070 | 2068 | 2061 | 2035 |
6 | 2053 | 2022 | 2057 | 2066 | 2039 | 2008 | |||
8 | 2068 | 2018 | 2059 | 2057 | 2050 | 1998 | |||
160 | 5 | 4 | 0.10 | 4366 | 4266 | 4398 | 4311 | 4340 | 4241 |
6 | 4291 | 4231 | 4320 | 4257 | 4248 | 4213 | |||
8 | 4268 | 4212 | 4350 | 4258 | 4281 | 4213 | |||
Number of optimal solutions | 0 | 1 | 0 | 0 | 0 | 5 |