From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | α | GA | SA | ABC | GWO | MBO | GATS |
---|---|---|---|---|---|---|---|---|---|
80 | 5 | 4 | 0.43 | 3093 | 3093 | 3077 | 3079 | 3074 | 3039 |
6 | 2308 | 2287 | 2342 | 2301 | 2283 | 2207 | |||
8 | 2152 | 2131 | 2198 | 2167 | 2121 | 2085 | |||
160 | 5 | 4 | 0.40 | 6463 | 6504 | 6501 | 6471 | 6515 | 6414 |
6 | 4926 | 4812 | 5029 | 4799 | 4813 | 4701 | |||
8 | 4567 | 4430 | 4663 | 4394 | 4594 | 4416 | |||
Number of optimal solutions | 0 | 0 | 0 | 1 | 0 | 5 |