From: Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Job | Stage | AGV | GA(s) | SA(s) | ABC(s) | GWO(s) | MBO(s) | GATS(s) |
---|---|---|---|---|---|---|---|---|
10 | 2 | 4 | 19.1 | 9.9 | 14.1 | 16.8 | 14.9 | 14.8 |
4 | 6 | 38.0 | 27.2 | 35.8 | 46.2 | 35.5 | 33.7 | |
6 | 6 | 57.6 | 39.8 | 53.1 | 68.1 | 56.1 | 49.9 | |
8 | 10 | 78.0 | 81.9 | 93.4 | 138.0 | 105.2 | 85.3 | |
10 | 10 | 94.5 | 99.7 | 116.0 | 170.5 | 131.9 | 106.5 | |
20 | 2 | 6 | 32.5 | 22.3 | 29.4 | 38.1 | 31.3 | 30.9 |
4 | 8 | 68.5 | 59.7 | 74.3 | 101.1 | 81.9 | 69.8 | |
6 | 12 | 110.3 | 131.9 | 145.3 | 217.0 | 176.1 | 138.5 | |
8 | 12 | 146.1 | 175.9 | 197.9 | 297.1 | 237.1 | 196.8 | |
10 | 14 | 181.2 | 255.6 | 281.6 | 418.3 | 344.0 | 256.1 |