Skip to main content

Table 7 Centroid offset data for batches 1–4 of cabin A of model S1

From: Digital Twin-based Quality Management Method for the Assembly Process of Aerospace Products with the Grey-Markov Model and Apriori Algorithm

Batch

A1

A2

A3

A4

A5

A6

A7

A8

1

8.691

9.571

4.126

4.515

6.336

8.937

9.819

10.021

2

4.366

7.135

3.126

3.725

4.210

7.979

9.190

9.322

3

7.978

4.715

5.226

6.687

7.804

8.045

8.159

9.188

4

5.918

5.205

4.393

4.520

5.105

5.818

6.647

7.560

Batch

A9

A10

A11

A12

A13

A14

A15

Model

1

11.005

11.365

11.472

11.479

12.147

13.255

13.672

S1

2

10.083

10.124

10.864

11.081

11.677

12.781

12.973

S1

3

9.729

10.782

10.868

10.983

13.653

14.657

16.948

S1

4

8.467

9.642

10.811

11.898

13.548

14.537

16.890

S1