Skip to main content

Table 8 Centroid offset data for batches 1–4 of cabin A of model S1

From: Digital Twin-based Quality Management Method for the Assembly Process of Aerospace Products with the Grey-Markov Model and Apriori Algorithm

Batch

A1

A2

A3

A4

A5

A6

A7

A8

1

5.310

7.491

7.949

8.365

8.524

9.299

9.417

9.757

2

6.066

6.595

7.975

8.008

8.349

9.148

9.873

10.051

3

4.178

7.442

7.571

8.960

9.793

9.934

10.292

10.467

4

6.866

7.177

7.336

7.453

8.121

8.557

8.928

9.636

Batch

A9

A10

A11

A12

A13

A14

A15

Model

1

10.025

10.824

11.122

11.294

11.492

12.967

14.223

S2

2

10.785

10.910

12.261

12.340

13.484

13.948

15.688

S2

3

10.641

10.682

11.449

11.575

11.891

12.043

12.792

S2

4

9.791

9.966

11.192

11.394

11.395

11.445

11.604

S2