Skip to main content

Table 1 Optimization group and control group initial parameters

From: Digital Twin Technology of Human–Machine Integration in Cross-Belt Sorting System

Operational parameters configuration

Pre-optimization

Post-optimization

Number of enabled layers

Double layer double zone

Single level double zone

Mainline speed (m/s)

2

2.2

Number of contributors

12

11

Number of packets collected

40

36

Rhythm of falling frames

Hoop-drop frame

Hoop-drop frame

Latticework shared

Not

Not